Having problems returning results to an SSRS report from both Tessitura and BIDS. How can I setup my trace so that I can see the parameter values being passed through tessitura to SSRS?
We are in a 64-bit SQL Server 2008 R2 Evironment
Thanks.
-doug
The trace event called RPC Completed is what was needed to capture the parms being used.