changing shows in a performance group once a package has been created

Former Member
Former Member $organization

Hi all,

 

I have to change which performance is in a particular performance group after the packages have been built, but before seats are sold (or rolled over). Can I do this? Or do I have to delete the package and start again? They are fixed seat packages and I’m not sure if the composite map will work if I change which performance is in the group.

 

Thanks,

 

Adrienne

 

Regards,

Adrienne Steer

Database and Accounts Manager

Kitchener-Waterloo Symphony | kwsymphony.ca
Conrad Centre for the Performing Arts
36 King St W
| Kitchener ON N2G 1A3

519.745.4711 x 285

asteer@kwsymphony.on.ca