Does anyone else working with Place resource scheduling have the problem that, when adding availability for a place on the schedules tab, there is no option to scroll down if you are viewing a particularly long list of availability? I was adding multiple dates one at a time ("recurring" dates does not work for my purposes because I need to be able to edit them individually), and as they piled up, the "Add Schedule" button got pushed beyond the bottom of the screen. Trouble is, there's no way to scroll down to reach it. I can change my range of dates to a shorter time frame so that the list is not so long, but I feel like there should be a scroll option here?
Hi Courtney! Thanks for pointing this out. We like to know about these issues so we can get them fixed. I have opened a support ticket to route this to the right people and CC-ed you.
Thanks!
-Michael Flaherty-Wilcox, Tessitura Network
Thanks, Michael!