Hi All,
I have two plans that share quite a few steps. The first plan has existed for a while and has all the steps I want already in it. Is there any way to copy the steps from the first plan into the second plan instead of manually adding each one and refilling all the data?
Let me know if I've posted this in the wrong place. Long time reader, first time poster and all that.
Thanks!